Loading...
Guest

Avatar

Ravi Patel

@CricketCoderRavi
Ravi Patel holds a B.Sc. in Electrical Engineering from Mumbai (2012) and an M.Sc. from Delft (2017), Certified Energy Manager and ScrumMaster; he built AI load-forecasting for Mumbai rail improving accuracy 25% and plays cricket.
Email
Private

Bio
Education & Skills: Ravi graduated with a B.Sc. in Electrical Engineering from the University of Mumbai (2012) and an M.Sc. in Smart Grids at TU Delft (2017). He holds Certified Energy Manager and ScrumMaster certifications.

Career Evolution: As Lead Systems Engineer at NextGrid Technologies, Ravi implemented an AI-driven load-forecasting platform for Mumbai’s suburban rail network, improving demand prediction accuracy by 25 percent.

Thought Leadership: Six articles in IEEE Transactions on Smart Grid, collectively read 80 000 times; he also contributes to open-source grid-optimization libraries.

Outside Interests: An avid cricket player and captain of his company team, Ravi also writes poetry in Gujarati during his morning commute.


Website
Profile Link

Social