Comprehensive Toilet and Bathroom Inspection Checklist

Start Interactive
Checklist

Inspecting toilet and bathroom items after installation is crucial for ensuring that everything functions correctly and safely. This checklist covers all key aspects from plumbing integrity to fixture stability, ensuring compliance with quality standards and safety regulations. Proper inspection helps avoid leaks, water damage, and other costly repairs. Use this interactive checklist to track progress, make notes, and export your findings as a PDF or Excel document with a unique QR code for verification.

  • Ensure plumbing and fixtures are correctly installed to prevent leaks and water damage.
  • Verify that all bathroom items meet safety and quality standards.
  • Interactive online checklist with tick, comment, and export features secured by QR code.
  • Avoid costly repairs by catching installation errors early.

Plumbing Inspection

Fixture Stability

Functionality Check

Safety and Compliance

Importance of Plumbing Checks

Plumbing issues can lead to significant water damage if not identified and corrected early. During the inspection, focus on identifying any leaks or pressure issues. A thorough plumbing check ensures that the installation is robust and ready for use.

  • Use a flashlight to inspect hard-to-see areas.
  • Check the operation of all valves.
  • Test water pressure to detect issues.

Ensuring Fixture Stability

Stable fixtures are a sign of quality and safety. Ensuring that toilets, sinks, and other fixtures do not move under pressure is crucial. This prevents future issues and ensures user safety.

  • Check for any wobbling or movement.
  • Ensure proper alignment and fastening.
  • Inspect mounting of accessories like mirrors.

How to Use This Checklist

  1. Click the “Use this checklist” button to launch interactive mode.
  2. Tick each item online as you complete it.
  3. Add comments on individual items or the entire form for observations or issues.
  4. Click Share or Download to download your completed checklist as PDF or Excel.
  5. Scan the QR code in the exported report to verify authenticity.
Hero image for Toilet and Bathroom Installation Inspection
Start Interactive Checklist
Toilet and Bathroom Inspection

Call to Action


Elie Saad's photo
Elie Saad
esaad.lb@gmail.com
Jun 24, 2025
1
229
15

FAQ

Question: How do I check for leaks in plumbing?

Use a flashlight to inspect all visible connections for water droplets or moisture. It's important to check both during and after running water through the system.

Question: What should I look for in fixture stability?

Ensure that toilets, sinks, and other fixtures do not move when pressure is applied. They should be aligned properly and securely fastened.

Question: How can I test the functionality of GFCI outlets?

Press the test button on the outlet. The reset button should pop out, cutting power to the outlet. Press reset to restore power, confirming functionality.