Guest

Temporary Works Inspection

Start Interactive
Checklist

Inspecting temporary works such as shoring and scaffolding is crucial to ensure safety and structural integrity on construction sites. Temporary works are temporary structures used to support loads during construction, including scaffolding and shoring systems. This checklist covers essential inspection points to verify stability, safety, and compliance before use. Ensuring temporary works are properly inspected helps avoid structural failures, accidents, and legal issues. This interactive checklist allows users to tick items online, leave comments, and export completed reports as PDF or Excel, complete with a unique QR code for authenticity.

  • Ensure safety and compliance by inspecting temporary works like shoring and scaffolding before use.
  • Check stability and structural integrity to prevent accidents and structural failures.
  • Interactive online checklist with tick, comment, and export features secured by QR code.

Pre-Inspection Preparation

Scaffolding Inspection

Shoring Inspection

General Inspection

Importance of Temporary Works Inspection

Temporary works such as scaffolding and shoring systems play a vital role in construction, providing essential support and safety measures. Inspecting these structures before use is critical to prevent accidents, ensure compliance with safety standards, and maintain site integrity. Regular inspections help identify potential hazards, such as unstable ground or defective materials, that could compromise the safety of workers and the public.

  • Prevents accidents and injuries by ensuring stability.
  • Ensures compliance with industry standards and regulations.
  • Identifies potential hazards early, reducing risk.

Common Issues in Temporary Works

Despite their temporary nature, scaffolding and shoring systems can face numerous issues if not regularly inspected. Common problems include improper erection, using damaged components, or exceeding load limits. These can lead to structural failures and serious safety incidents. Implementing a thorough inspection routine is essential to mitigate these risks and ensure a safe working environment.

  • Improper erection can lead to structural failures.
  • Using damaged components increases risk of collapse.
  • Exceeding load limits can compromise stability.

How to Use This Interactive Checklist

  1. Click the 'Use this checklist' or 'Start Interactive Checklist' button to launch interactive mode.
  2. Tick each item online as you complete it.
  3. Add comments on individual items or the entire checklist.
  4. Click 'Share' or 'Download' to download your completed checklist as PDF or Excel.
Temporary Works Inspection Checklist
Start Interactive Checklist
Temporary Works Inspection

Tatiana Ivanova
336
75
1
5

FAQ

Question: How often should temporary works be inspected?

Temporary works should be inspected before use, after any significant alterations or incidents, and periodically based on site conditions and project duration. Regular inspections ensure ongoing safety and compliance.

Question: What should I do if I find a defect during inspection?

Report any defects immediately to the site supervisor and take necessary precautions to secure the area. Repairs or replacements should be made before the temporary works are used.

Question: Can I modify scaffolding or shoring without approval?

No, any modifications to scaffolding or shoring must be approved by a qualified engineer and documented. Unapproved changes can compromise safety and stability.