Daily Construction Delay Report image
Daily Construction Delay Report
Apr 19, 2025
⏳ Estimated reading time: 1 min
Download a free Daily Site Delay Report sample in PDF format. Document daily delays, causes, site conditions, and corrective actions with this clear, ready-to-use form.
Daily Construction Delay Report | Free PDF, Excel Sample Download

Daily Site Delay Report Sample (Free PDF, Excel)

Accurate documentation of daily delays is critical for managing claims and ensuring transparency in any construction project. This Daily Site Delay Report Sample helps you formalize delay incidents by capturing key information on-site.

The PDF includes:

  • Date & location

  • Weather conditions

  • Activity affected

  • Time & nature of the delay

  • Responsible party

  • Schedule impact

  • Corrective action

  • Safety and remarks

Use this form as part of your daily reporting system to strengthen project records and support future Extension of Time (EOT) claims.

daily construction delay report


Download (PDF) daily construction delay report

Download (Excel) daily construction delay report

Download (Word) daily construction delay report


Having trouble opening the office files?
If your system opens it in Protected View or blocks editing, right-click the file → Properties → click Unblock , then re-open the file.



E
Elie Saad
esaad@quollnet.com
6 6
Apr 19, 2025
👁️ 1.08k+ 👉 146

Related Articles


Construction Delay Log
⏳ 2 min read
Construction Delay Log Template | Excel, Pdf & Word Download
Download a free Construction Delay Log Template in Excel, PDF, and Word formats. Log delays by activity, cause, and EOT ID. Track impacts and submit claims with ease.
Personal Protective Equipment Check List
⏳ 4 min read
Daily Ppe Inspection Checklist For Construction Sites: Ensure Safety & Compliance
Download our free PPE checklist for construction sites. Ensure OSHA compliance and worker safety with daily inspections of hard hats, safety glasses, gloves, and more.
Eot Claim Checklist
⏳ 1 min read
Eot Claim Checklist | Free Extension Of Time Submission Guide
Download a free EOT Claim Submission Checklist to ensure your Extension of Time requests meet contract requirements. DOCX, Word, PDF format for easy editing.
Delay Analysis Construction
⏳ 4 min read
Delay Analysis In Construction | Methods, Legal Claims, Eot Tools, And Ai Assistant
Learn about top delay analysis methods in construction, legal strategies for EOT claims, and access free tools including the free DelayClaims AI Assistant, method selector excel and others.
Incident Report Review Corrective Actions Construction Safety
⏳ 3 min read
Enhancing Construction Safety: Effective Incident Report Reviews And Corrective Actions
Learn how systematic incident report reviews and corrective actions can improve construction site safety. Download our comprehensive safety checklist to implement best practices.
Powerd by Quollnet.com